CNC Press Brake bendIT 3.2-100
How can we help?
Description
bendIT 3.2-100 CNC PRESS BRAKE – MLT
CNC press brake for precise sheet metal bending – 3,200 mm, 100 tons.
From the Military Laser Tech portfolio: MT15 CNC control combined with hydraulic, electrical and positioning components from established manufacturers. The CNC system manages work programs, punches, dies and bending parameters.
Technical parameters
- Bending length: 3,200 mm
- Pressing force: 100 tons
- Axis control: Y1–Y2
- Control system: MT15 CNC – 1 GHz processor, 256 MB RAM, 4 GB storage
Top-tier components
- High-frequency hydraulic valves: Rexroth (Germany)
- Proportional pressure valve: Hengli Hydraulic (USA)
- Magnetic linear encoder: GIVI (Italy)
- X, R and Y axis servo motors: INOVANCE
- Electrical components: Schneider Electric (France)
- Seals: NOK (Japan)
- Oil pump: Parker (USA)
- Laser safety curtain: DSP (Italy)
MT15 CNC functions
- Product management and program archiving
- Punch library – selection, setup and adjustment
- Die library – selection and auxiliary parameters
- Bending parameter setup for the tools in use
- Remote assistance: network module for diagnostics and troubleshooting over the internet
Applications
- Bent sheet metal parts, within the capacity of the machine and tooling
- Metal fabrication: brackets, consoles, housings
- Industrial equipment: panels, covers, assembly components
- Cabinets, boxes and technical enclosures
- Profiles and bent elements for construction and fit-out
Safety and documentation
- DSP laser curtain for operator protection
- Operating manual, warranty certificate, CE declaration of conformity, periodic maintenance schedule
Delivery, installation and support
- Free delivery within Romania; lead time stated in the offer: 90–100 days
- Installation and commissioning: 7–14 working days, depending on the model
- Free technical training in Romania, under the contract terms
- 24-month warranty, extendable to 36 months, under the contract terms
- Service in Romania during and, optionally, after warranty; 48 h response, as per the offer
- Consumables on request, supplied separately